The generation’s of the electrical supply was completed on time and met with the overall project schedule, meaning that the re-opening of the historic site went ahead as planned.

Private Power Productions

One thought on “Private Power Productions

  • June 28, 2018 at 7:37 am
    Permalink

    The energization of the electrical supply was completed on time and met with the overall project schedule, meaning that the re-opening of the historic site went ahead as planned.